[hobbit] Migrating Hobbit from one server to the next
Tod Hansmann
thansmann at directpointe.com
Fri Nov 9 19:16:49 CET 2007
Make sure the dependencies are installed, of course (like RRD and
whatnot). Also when we migrated we had a problem with permissions for
apache, so heads up on making sure those are setup correctly =cP I
imagine you've covered that base, but whatever helps.
Tod Hansmann
Network Engineer
<http://www.directpointe.com/>
________________________________
From: Josh Luthman [mailto:josh at imaginenetworksllc.com]
Sent: Friday, November 09, 2007 10:44 AM
To: hobbit at hswn.dk
Subject: [hobbit] Migrating Hobbit from one server to the next
I am planning on migrating Hobbit to another server (the one it is on
now is just a test box).
The only thing I should need to do is tar the ~hobbit directory, move it
over and start it up, correct? Linux will figure out the modules for
hardware and the IP will work on that leg of the network.
Currently the destination server is running BB which is why I need to
have downtime to a minimum!
Thanks for any advice!
Josh
--
Josh Luthman
Office: 937-552-2340
Direct: 937-552-2343
1100 Wayne St
Suite 1337
Troy, OH 45373
Those who don't understand UNIX are condemned to reinvent it, poorly.
--- Henry Spencer
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.xymon.com/pipermail/xymon/attachments/20071109/537ee302/attachment.html>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.gif
Type: image/gif
Size: 1744 bytes
Desc: image001.gif
URL: <http://lists.xymon.com/pipermail/xymon/attachments/20071109/537ee302/attachment.gif>
More information about the Xymon
mailing list