[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
NCV ?
- To: <hobbit (at) hswn.dk>
- Subject: NCV ?
- From: "Joshua Krause" <forums (at) triadbiz.rr.com>
- Date: Fri, 30 May 2008 09:06:02 -0400
- Thread-index: AcjCVehUW0emeCopQjSibU70tjF5rQ==
I am wondering if I need to graph multiple values and want them to be on
different graphs, how do I setup hobbitgraph.cfg to create separate graphs?
Here is my message file:
<!--
VOLT: {sysV}
CURR: {sysCurr}
-->
System Voltage: {sysV}V
System Current: {sysCurr}A
And here is my hobbitgraph.cfg:
[power]
TITLE Power
YAXIS Current
DEF:in (at) RRDIDX@=power.rrd:CURR:AVERAGE
DEF:out (at) RRDIDX@=power.rrd:VOLT:AVERAGE
AREA:in (at) RRDIDX@#00CF00:@RRDPARAM@ Current
GPRINT:in (at) RRDIDX@:LAST: \: %5.1lf A (cur)\g
GPRINT:in (at) RRDIDX@:MAX: \: %5.1lf A (max)\g
GPRINT:in (at) RRDIDX@:MIN: \: %5.1lf A (min)\g
GPRINT:in (at) RRDIDX@:AVERAGE: \: %5.1lf A (avg)\n
LINE1:out (at) RRDIDX@#002A97:@RRDPARAM@ Voltage
GPRINT:out (at) RRDIDX@:LAST: \: %5.1lf V (cur)\g
GPRINT:out (at) RRDIDX@:MAX: \: %5.1lf V (max)\g
GPRINT:out (at) RRDIDX@:MIN: \: %5.1lf V (min)\g
GPRINT:out (at) RRDIDX@:AVERAGE: \: %5.1lf V (avg)\n
Thanks
-Josh