Availability Report calculation



Hi Henrik,

I'm running on my test-server Hobbit 4.1.2p1. I've run the 3 cronjobs from the hobbitreports.sh-header (a great and very welcome feature!) and I'm studying the generated reports. I see a discrepancy between the man-page and the calculations. I have no REPORRTIME set. I would like to read your comment on my two observations.

First: When I look at yesterday's generated availability report, it says everything is fine (the solid green boxes). But when I look at the history, I can see that soms services (msgs fi) had the status 'clear' the entire day(!), so it should be calculated to 'red' according to the man-page (see below). However, I _do_ prefer this behaviour, that clear is calculated as green, because this means that (1) the host was up, (2) the test has run and valid data was received. But than the man-pages should be adapted.



Second: I also have some tests that had the status 'purple' the entire day(!) and that is treated as 'OK' too (the solid green boxes)!? This is correct according to the same man-page, but I would say that purple should not be calculated as solid green boxes. In my case NO test data was reported the entire day. I would suggest it should show on the availability report in red digits 0%.



Kind regards and thanks again (and again and...) for making such a GREAT product!

Peter

From the man-page (.../bb-hosts.5.html#lbAK):
[snip]

* Only measurements done during the given time period is used for the calculation.
* "blue" time reduces the length of the report interval, so if you are generating a report for a 10-hour period and there are 20 minutes of "blue" time, then the availability calculation will consider the reporting period to be 580 minutes (10 hours minus 20 minutes). This allows you to have scheduled downtime during the REPORTTIME interval without hurting your availability; this is (I believe) the whole idea of the downtime being "planned".
* "red" and "clear" status counts as downtime; "yellow" and "green" count as uptime. "purple" time is ignored.


The availability calculation correctly handles status changes that cross into/out of a REPORTTIME interval.

If no REPORTTIME is given, the standard 24x7 calculation is used.

[snip]