[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: [hobbit] Graph Limits



I like that feature a lot! 

-----Original Message-----
From: Henrik Stoerner [mailto:henrik (at) hswn.dk] 
Sent: Friday, February 04, 2005 7:11 AM
To: hobbit (at) hswn.dk
Subject: Re: [hobbit] Graph Limits
Importance: Low

On Tue, Feb 01, 2005 at 05:10:38PM -0700, Charles Jones wrote:
> Sometimes a large spike can ruin a graph, because the graph then 
> scales to the max size of the spike, so the rest of the graph isn't 
> very readable as it is now scrunched down to almost a flat line.  Is 
> it possible to have an option for Hobbits larrding so that you can 
> define a maximum threshold not to extend past?

I've worked on this a bit, and so far I've come up with the solution that
you can see on my site - e.g. if you go to
http://www.hswn.dk/hobbit/servers/ , pick the "cpu" display for the first
host, and click the graph to see the 4 periodic graphs.

Direct link:
http://www.hswn.dk/hobbit-cgi/hobbitgraph.sh?host=voodoo.hswn.dk&service=la

At the bottom of the page you can define the lower- and upper-limit for the
graph, and which periodic graph you want to see. E.g enter "0.5" in the
upper-limit, click "View" and you'll get graphs that cut off spikes at load
0.5.

Something like that you had in mind ?


Henrik

To unsubscribe from the hobbit list, send an e-mail to
hobbit-unsubscribe (at) hswn.dk